Skip to content

Zovo Project Timeline

by theluckystrike · remote · no sign-in to list tools · v1.0.0 · published by GitHub user theluckystrike

A Gantt chart maker and project timeline planner that works inside the chat.

Changes · 1

2 tools: 1 change things and 1 only read.

Scanned Oct 22, 2026

No check matched anything in the tool definitions. No finding is not a safety guarantee. How the checks work.

claude mcp add --transport http gantt-timeline https://gantt-timeline.zovo.one/mcp

Tools

Open a tool for its reasons and full description. Descriptions are the publisher's own words, shown as they are.

2 tools

Changes things 1Claude Code: ask
  • plan_project_timelineUse this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duratio…No findings

    Why it is in this group

    • Nothing in its name or description says what it does, so it is counted as a write.
    • The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
    Description, as the server wrote it
    Use this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float (critical path method). Takes tasks with durations (days or weeks), finish-to-start dependencies with optional lags, optional start-no-earlier-than dates, owners and milestones, plus a start date and a business-day calendar with country public holidays or calendar days. Returns every task's dates and float, the critical path, milestones and the end date, an interactive Gantt chart, and CSV, .ics and SVG downloads. Detects dependency loops and unknown task names. Does not save projects, sync with project tools, track progress, or level resources. Do not use for a single date difference or for daily to-do planning.

    Annotations the server declares

    • title: Plan project timeline
    • readOnlyHint: true
    • destructiveHint: false
    • openWorldHint: false
    • idempotentHint: true
Only reads 1Claude Code: allow
  • compare_timeline_scenariosUse this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" o…No findings

    Why it is in this group

    • The name "compare_timeline_scenarios" says "compare": a word for reading.
    Description, as the server wrote it
    Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).

    Annotations the server declares

    • title: Compare timeline what-ifs
    • readOnlyHint: true
    • destructiveHint: false
    • openWorldHint: false
    • idempotentHint: true

This is not a safety rating, and no finding is not a safety guarantee. The groups and findings come from fixed checks of the tool definitions the server returned on the date shown, not from its code or what it does when called. How the checks work.

Install

Pinned to version 1.0.0. Values in angle brackets are yours to fill in.

claude mcp add --transport http gantt-timeline https://gantt-timeline.zovo.one/mcp

Run in a terminal.

Claude Code permissions

Allow the reads, ask before a change, deny the deletes. Paste into .claude/settings.json.

.claude/settings.json
{
  "permissions": {
    "allow": [
      "mcp__gantt-timeline__compare_timeline_scenarios"
    ],
    "ask": [
      "mcp__gantt-timeline__plan_project_timeline"
    ],
    "deny": []
  }
}

Tools that only read are allowed, tools that change things ask first, tools that delete or cancel are denied. It assumes the server is installed as gantt-timeline. Review it before you use it.